How It Works

How one issue moves from detection to verified outcome.

Follow a single operational issue — from the moment Mobius detects it through to measured, verified proof that the problem was resolved.

Step 1

Data enters from trusted infrastructure

Before anything is detected, Mobius needs a foundation. It connects directly to national energy data infrastructure — half-hourly settlement records across every meter point in a portfolio. No hardware. No supplier feeds. No site visits.

National settlement data

Half-hourly interval reads from trusted infrastructure

BMS & sub-metering

Connects where available for deeper granularity

Billing & contracts

Tariff and supplier data for cost validation

No hardware to begin

Portfolio baseline delivered without site visits

With this foundation in place, Mobius continuously monitors every meter point in the portfolio. Here is what happens when it finds something.

Step 2 — Real Example

AHU scheduling drift — Building 7, Zone B

A real issue, moving through the full Mobius loop from detection to verified outcome.

Detect

AHU units running 14 hours outside occupancy

Mobius identifies that AHU scheduling in Zone B does not align with occupancy patterns. The detection is based on half-hourly interval data from the national settlement record — not a BMS alert, not a site visit.

Source: National settlement data

Rank

Estimated NOI impact: £42,000 per year

The issue is automatically ranked against every other opportunity in the portfolio. At £42,000 estimated annual impact with low resolution complexity, it sits at position #1.

Ranked #1 of 47 open opportunities

Route

FM team assigned — due 15 March

The action is pushed into the existing CAFM system. The FM team receives a specific task: correct AHU scheduling in Building 7, Zone B. The task has an assigned owner, a due date, and escalation rules.

Owner: J. Harris · CAFM ref: WO-4471 · Escalation: 5 days

Act

Schedule corrected in BMS

The FM team adjusts the AHU schedule to align with occupancy. The work order is completed and marked closed in the CAFM system. Mobius records the completion timestamp.

Completed: 12 March · 3 days ahead of deadline

Verify

£42,000 annual saving confirmed against baseline

Mobius measures post-intervention consumption against the pre-intervention baseline using the same national settlement data. The reduction is real, measured, and traceable — not estimated, not modelled.

Verified saving: £42,000 · Method: measured baseline comparison

Why This Works

The action did not sit in a dashboard. It moved through workflow.

In the example above, J. Harris did not log into a portal to find the issue. The task arrived in the system they already use, with a clear brief, a deadline, and consequences if it slipped.

Named owner

Every action is assigned to a specific person — not a team inbox

Due date

Clear deadlines that are tracked and enforced

Escalation

Overdue actions escalate automatically to senior stakeholders

Existing tools

Actions route into CAFM, BMS, or maintenance systems already in use

The Proof

The £42,000 saving was not claimed. It was measured.

After the AHU schedule was corrected, Mobius continued monitoring the same national settlement data. The pre-intervention baseline was compared to post-intervention actuals. The saving is real, traceable, and ready for reporting.

Verification Summary — Building 7, Zone B

Issue

AHU scheduling drift

Pre-intervention baseline

National settlement record

Action taken

Schedule corrected in BMS

Completed

12 March — 3 days ahead of deadline

Verified saving

£42,000 per year

Method

Measured baseline comparison

Status

Diligence-ready

Get Started

See the full loop on your portfolio.

We'll walk through how Mobius connects to your data, where the highest-impact opportunities are, and how proof is created.